1. Product Description
Dry
Dancing Fountain is installed underground. So it is also called as Land
Fountain or Floor Fountain. During the fountain performance, people
could walk through and play with water. Without water pool on the
ground, people are free to walk on it and the fountain won’t affect the
traffic when the fountain stops.
Fountain
could dance is due to the control system. Generally two type of control
modes are available: one is PLC (programmable Logistics Controller),
another is customized software which pre-installed on computer. Both
type of control modes could adapt to music fountain or non-music
fountain.
The advantage of PLC fountain is easy
operation. The program has been pre-written on the PLC, and the fountain
will work automatically. Meanwhile, it is competitive in cost.
The
advantage of multimedia software fountain is to program the fountain
performance freely from the software. So the fountain could express the
beauty of water according to different music.
So
generally, Control mode of PLC is more suitable for smaller fountain,
and that of customized Software is more suitable for lager scale of
fountain.
2. Company Information
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. Our Advantages
|
|
|
|
|
|
|
|
|
|
|
|
4. Fountain Project Flowchart
5. Fountain Installation Site
6. Overseas Clients
7. Our Service
Fountain design (finish within 3 working days)
Animation video is available upon request (this service is chargeable)
Fountain manufacturing with top grade material
On-site installation and technical training
12-month free warranty (responese within 24 hours)
Life long free technical support (response within 24 hours)
8. What information we need from you, to make a suitable fountain proposal:
a. Fountain Type(multimedia software control, music dancing, program control, static)
b. Fountain Site(Sea, Lake or River, Concrete Water Pool)
c. Fountain Size & Water Depth(Length & Width, Diameter, picture or CAD drawing)
d. Water Quality (fresh water or sea water)
e. Power Supply(voltage, frequency, single phase or 3 phase)
f. Target Budget (if you have)
g. Special Requirements (if you have)